Skip to content
IT ElectricPros

Bay Area Electrical Service

Panel Upgrades in the San Francisco Bay Area

200-amp service upgrades built for EVs, heat pumps, and induction cooking.

What this service covers

Older Bay Area homes were wired for a fraction of today's load. We size, permit, and install modern service panels so your home can carry an EV charger, heat pump, and induction range at once.

What's included

  • Title 24 compliant load calculations
  • Permits and utility coordination handled for you
  • Surge-protected, EV-ready panel layouts
  • Clean labeling and as-built circuit directory

How the visit works

  1. 01Load studyWe calculate present and planned demand, including EV and electrification projects.
  2. 02Permit and scheduleWe pull the permit, coordinate the utility disconnect, and set an install date.
  3. 03Install and inspectMost upgrades finish in one day, followed by municipal inspection sign-off.

Panel Upgrades FAQs

Do I need 200 amps?

If you plan on an EV charger plus electric heating or cooking, 200A is usually the right long-term call.

How long is the power off?

Typically six to eight hours on install day, scheduled around your household.

Ready to schedule panel upgrades?

Same-day appointments across San Francisco, the Peninsula, and the East Bay. Flat-rate pricing quoted before we start.